18.08.2010 | Deskman: Marcel Dröttboom

Zug, Switzerland – A susidiary of Foster Wheeler’s Global Power Group has been awarded a contract by Daewoo Engineering for the design and supply of two circulating fluidized-bed (CFB) steam generator systems for PT Merak Energi. The project is located in Banten Province on the western part of Java Island in Indonesia.
Foster Wheeler has received a full notice to proceed on this contract. The terms of the agreement were not disclosed and the contract value will be included in the company‘s third quarter 2010 bookings. Commercial operation of the new steam generator systems is scheduled for third quarter of 2012.
Foster Wheeler will design and supply the two 60 MWe Circulating Fluidized-Bed (CFB) steam generators and auxiliary equipment and provide site advisory services for the project. The CFB steam generators will be designed to burn local coal.
This article is protected by copyright. You want to use it for your own purpose? Infos can be found under www.mycontentfactory.de (ID: 357469)