06/21/2012 | Editor: Marcel Dröttboom

Jacobs Engineering Group announced that it was awarded a contract from Chevron Phillips Chemical Company LP (CPChem) to provide front end engineering and design (FEED) services for two polyethylene facilities.
Pasadena (CA); USA – The two polyethylene facilities planned are part of CPChem's U.S. Gulf Coast (USGC) Petrochemicals Project, to be located on a site in Old Ocean, Texas near the Chevron Phillips Chemical Sweeny facility. Each facility is expected to utilize CPChem's proprietary Loop Slurry Technology.
Officials did not disclose the contract value.
This article is protected by copyright. You want to use it for your own purpose? Infos can be found under www.mycontentfactory.de (ID: 34267860) | Archiv: Vogel Business Media
Leave a comment