Ma’aden Alcoa Bauxit Mine

HLG JV wins Project related to Ma’aden Alcoa Bauxit Mine

05/03/2012 | Editor: Marcel Dröttboom

The HLG JV was awarded a contract for the construction of mine-related infrastructure for the Ma’aden Alcoa Aluminium joint venture’s bauxite mine.
The HLG JV was awarded a contract for the construction of mine-related infrastructure for the Ma’aden Alcoa Aluminium joint venture’s bauxite mine.

Habtoor Leighton Group in joint venture with Dragados Gulf Construction Company / Intecsa Industrial (ACS Group), has been awarded a USD 169 million contract in Saudi Arabia for the construction of mine-related infrastructure for the Ma’aden Alcoa Aluminium joint venture’s bauxite mine.

The project is located at Al Ba’itha in a desert landscape approximately 200 kilometres north-east of the city of Burayda in the Qassim central region of Saudi Arabia. The mineral from the bauxite mine will be transported by train using the North-South Railway that connects the mine to the aluminium smelter Ma’aden is constructing at Ras Al Khair.

The Habtoor Leighton Group/Dragados Gulf/Intecsa scope of works includes construction of a pioneer fly camp and temporary facilities main camp, the material handling system, including crushing plant and mechanical conveyors, a 250 times 200 metre mine village, including accommodation, as well as connecting roads and utilities.

Leave a comment

This article is protected by copyright. You want to use it for your own purpose? Infos can be found under www.mycontentfactory.de (ID: 33527610) | Archiv: Vogel Business Media